if three data connectors point from a sink to three activities which path does the process flow take |
|
Back to top |
|
 |
jmac |
Posted: Wed May 21, 2003 1:28 pm Post subject: |
|
|
 Jedi Knight
Joined: 27 Jun 2001 Posts: 3081 Location: EmeriCon, LLC
|
Parhasith:
OK... we've got some major problems here.
First I will assume that we are talking about 3 Data connectors going from a SOUCRE to three different activities. Data connectors can not be drawn from a Sink to an activity.
Next, Data connectors have nothing to do with control flow, so this question can not be answered. _________________ John McDonald
RETIRED |
|
Back to top |
|
 |
Prahasith |
Posted: Wed May 21, 2003 1:38 pm Post subject: daat connectors |
|
|
 Disciple
Joined: 16 May 2003 Posts: 184 Location: Kansas City
|
yeah sorry abt that
thats the source
which activity starts first then |
|
Back to top |
|
 |
jmac |
Posted: Wed May 21, 2003 1:51 pm Post subject: |
|
|
 Jedi Knight
Joined: 27 Jun 2001 Posts: 3081 Location: EmeriCon, LLC
|
Well like I said.... Data connectors have nothing to do with Control flow, so If I take what you say literally, ALL three will start at once. I must say that I doubt that this is what you want. _________________ John McDonald
RETIRED |
|
Back to top |
|
 |
Ratan |
Posted: Wed May 21, 2003 4:09 pm Post subject: |
|
|
 Grand Master
Joined: 18 Jul 2002 Posts: 1245
|
The first activity to start is always the one which has no other control connectors pointing to it. so if you have 3 activities with no control connectors pointing to them, they all will start in parallel. _________________ -Ratan |
|
Back to top |
|
 |
Prahasith |
Posted: Wed May 21, 2003 5:23 pm Post subject: hi |
|
|
 Disciple
Joined: 16 May 2003 Posts: 184 Location: Kansas City
|
Thank you guys you have been very helpful to me
bare with my basic doubts |
|