Author |
Message
|
amateur10 |
Posted: Sat Dec 10, 2005 5:32 pm Post subject: Unable to delete failed flow |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
I have a new problem. I could not delete the failed flow. When I tried, it gives error messaage as follows:
Failed to delete the unresolved flow.
The components type either be CONNECTOR or COLLABORATION.
what does this mean and how to delete the unresolved /failed flow
thanks guys |
|
Back to top |
|
 |
vennela |
Posted: Sat Dec 10, 2005 6:19 pm Post subject: |
|
|
 Jedi Knight
Joined: 11 Aug 2002 Posts: 4055 Location: Hyderabad, India
|
Maybe you deleted the original collaboration or the connector.
Don't worry about it. |
|
Back to top |
|
 |
djeripo |
Posted: Sat Dec 10, 2005 6:45 pm Post subject: |
|
|
 Master
Joined: 25 Jan 2004 Posts: 225
|
If you dont want see those,Go to your ICS DB and delete the failed flows from the CX tables and also if you use DeliveryTransport as 'MQ' remove the messages from your adapter queue. |
|
Back to top |
|
 |
amateur10 |
Posted: Sat Dec 10, 2005 6:50 pm Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
I guessed that the error is due to the deletion of the original object. what Can i do now? As djeripo has suggested I need to go to ics repos and delete these records.
I will try.
Thanks a lot |
|
Back to top |
|
 |
amateur10 |
Posted: Sat Dec 10, 2005 7:13 pm Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
Hi djeripo,
Sorry for asking small stuff, but there are more then one ta bles containing record of failed flow right? So, how which tables contains the recrds and should I delete from all of them? |
|
Back to top |
|
 |
amateur10 |
Posted: Sat Dec 10, 2005 8:13 pm Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
I cleared the flow from two talbes. However, there is still problem in deploying the collaboration object. While deploying, it gives the following error.
Collaboration T cannot be activated because it failed to recover unprocessed events.Reason: The recovery process failed because the unprocessed event must be resent to connector Object INCONN of type Connector was not found., andthe connector is not available.
The deployment succeeded
the INCONN was once created connector and now i deleted that and all the failed flow.
could you please suggest how can I fix this problem? |
|
Back to top |
|
 |
djeripo |
Posted: Sat Dec 10, 2005 9:02 pm Post subject: |
|
|
 Master
Joined: 25 Jan 2004 Posts: 225
|
Quote: |
Hi djeripo,
Sorry for asking small stuff, but there are more then one ta bles containing record of failed flow right? So, how which tables contains the recrds and should I delete from all of them? |
CXWIPOBJECTS,CXWIPBLOBS |
|
Back to top |
|
 |
amateur10 |
Posted: Sat Dec 10, 2005 9:22 pm Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
I DELETED the failed flow. But the message still coming while deploying the collaboration object. Also, I choose delivery transport to MQ but inveing. Is there any other way what I could do to solve this problem?
thanks |
|
Back to top |
|
 |
djeripo |
Posted: Sat Dec 10, 2005 9:38 pm Post subject: |
|
|
 Master
Joined: 25 Jan 2004 Posts: 225
|
Did you delete the event from the AP queue? |
|
Back to top |
|
 |
amateur10 |
Posted: Sat Dec 10, 2005 9:46 pm Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
I deleted stuff from three different tables. One of them was key or something. What else do you mean?
I chekcked every table that has data like failed flow, and i deleted from three tables - two as you suggested and one more table that has key of failed flow. what else ?
It is so annyoing |
|
Back to top |
|
 |
kotha |
Posted: Sat Dec 10, 2005 9:56 pm Post subject: |
|
|
Partisan
Joined: 12 Mar 2005 Posts: 333
|
|
Back to top |
|
 |
djeripo |
Posted: Sun Dec 11, 2005 2:39 am Post subject: |
|
|
 Master
Joined: 25 Jan 2004 Posts: 225
|
Amateur Wrote:
Quote: |
I DELETED the failed flow. But the message still coming while deploying the collaboration object. Also, I choose delivery transport to MQ but inveing. Is there any other way what I could do to solve this problem? |
Since you chose DeliveryTransport as 'MQ',Its mandatory you should have defined a queue like AP/YourConnector/YourICSServerName.
After purging the data in WIP tables,Gohead and also purge the messages in your AP/YourConnector/YourICSServerName queue. |
|
Back to top |
|
 |
amateur10 |
Posted: Sun Dec 11, 2005 9:20 am Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
Thanks for help. My system is not working now. Once, I get it working, I will send my system jar file
thanks a lot |
|
Back to top |
|
 |
amateur10 |
Posted: Sun Dec 11, 2005 5:06 pm Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
Hi pachyderm,
I sent jar file to you. But I got it working now using testconnector. I deleted everything from contrl centre in db and setup another db. Then it works.
thanks for willingness to look into my project. |
|
Back to top |
|
 |
amateur10 |
Posted: Fri Dec 16, 2005 11:05 am Post subject: |
|
|
Centurion
Joined: 23 Nov 2005 Posts: 102
|
I have again the same problem of failed flow and i can not delete them. the project is still running but I can not delete them. the error message is
the component type is connector or colaboration.
I started ics with -i option, I deleted the repository but still invein. Can some one suggest how i can delete them
thanks |
|
Back to top |
|
 |
|