ASG
IBM
Zystems
Cressida
Icon
Netflexity
 
  MQSeries.net
Search  Search       Tech Exchange      Education      Certifications      Library      Info Center      SupportPacs      LinkedIn  Search  Search                                                                   FAQ  FAQ   Usergroups  Usergroups
 
Register  ::  Log in Log in to check your private messages
 
RSS Feed - WebSphere MQ Support RSS Feed - Message Broker Support

MQSeries.net Forum Index » WebSphere Interchange Server + Adapters » Unable to delete failed flow

Post new topic  Reply to topic Goto page 1, 2  Next
 Unable to delete failed flow « View previous topic :: View next topic » 
Author Message
amateur10
PostPosted: Sat Dec 10, 2005 5:32 pm    Post subject: Unable to delete failed flow Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

I have a new problem. I could not delete the failed flow. When I tried, it gives error messaage as follows:

Failed to delete the unresolved flow.

The components type either be CONNECTOR or COLLABORATION.

what does this mean and how to delete the unresolved /failed flow

thanks guys
Back to top
View user's profile Send private message
vennela
PostPosted: Sat Dec 10, 2005 6:19 pm    Post subject: Reply with quote

Jedi Knight

Joined: 11 Aug 2002
Posts: 4055
Location: Hyderabad, India

Maybe you deleted the original collaboration or the connector.
Don't worry about it.
Back to top
View user's profile Send private message Send e-mail Visit poster's website
djeripo
PostPosted: Sat Dec 10, 2005 6:45 pm    Post subject: Reply with quote

Master

Joined: 25 Jan 2004
Posts: 225

If you dont want see those,Go to your ICS DB and delete the failed flows from the CX tables and also if you use DeliveryTransport as 'MQ' remove the messages from your adapter queue.
Back to top
View user's profile Send private message Visit poster's website
amateur10
PostPosted: Sat Dec 10, 2005 6:50 pm    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

I guessed that the error is due to the deletion of the original object. what Can i do now? As djeripo has suggested I need to go to ics repos and delete these records.

I will try.

Thanks a lot
Back to top
View user's profile Send private message
amateur10
PostPosted: Sat Dec 10, 2005 7:13 pm    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

Hi djeripo,

Sorry for asking small stuff, but there are more then one ta bles containing record of failed flow right? So, how which tables contains the recrds and should I delete from all of them?
Back to top
View user's profile Send private message
amateur10
PostPosted: Sat Dec 10, 2005 8:13 pm    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

I cleared the flow from two talbes. However, there is still problem in deploying the collaboration object. While deploying, it gives the following error.

Collaboration T cannot be activated because it failed to recover unprocessed events.Reason: The recovery process failed because the unprocessed event must be resent to connector Object INCONN of type Connector was not found., andthe connector is not available.

The deployment succeeded

the INCONN was once created connector and now i deleted that and all the failed flow.

could you please suggest how can I fix this problem?
Back to top
View user's profile Send private message
djeripo
PostPosted: Sat Dec 10, 2005 9:02 pm    Post subject: Reply with quote

Master

Joined: 25 Jan 2004
Posts: 225

Quote:
Hi djeripo,

Sorry for asking small stuff, but there are more then one ta bles containing record of failed flow right? So, how which tables contains the recrds and should I delete from all of them?

CXWIPOBJECTS,CXWIPBLOBS
Back to top
View user's profile Send private message Visit poster's website
amateur10
PostPosted: Sat Dec 10, 2005 9:22 pm    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

I DELETED the failed flow. But the message still coming while deploying the collaboration object. Also, I choose delivery transport to MQ but inveing. Is there any other way what I could do to solve this problem?

thanks
Back to top
View user's profile Send private message
djeripo
PostPosted: Sat Dec 10, 2005 9:38 pm    Post subject: Reply with quote

Master

Joined: 25 Jan 2004
Posts: 225

Did you delete the event from the AP queue?
Back to top
View user's profile Send private message Visit poster's website
amateur10
PostPosted: Sat Dec 10, 2005 9:46 pm    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

I deleted stuff from three different tables. One of them was key or something. What else do you mean?

I chekcked every table that has data like failed flow, and i deleted from three tables - two as you suggested and one more table that has key of failed flow. what else ?

It is so annyoing
Back to top
View user's profile Send private message
kotha
PostPosted: Sat Dec 10, 2005 9:56 pm    Post subject: Reply with quote

Partisan

Joined: 12 Mar 2005
Posts: 333

Send the your project jar file to mqworkflow@gmail.com. Let me have a look at it
Back to top
View user's profile Send private message
djeripo
PostPosted: Sun Dec 11, 2005 2:39 am    Post subject: Reply with quote

Master

Joined: 25 Jan 2004
Posts: 225

Amateur Wrote:
Quote:
I DELETED the failed flow. But the message still coming while deploying the collaboration object. Also, I choose delivery transport to MQ but inveing. Is there any other way what I could do to solve this problem?


Since you chose DeliveryTransport as 'MQ',Its mandatory you should have defined a queue like AP/YourConnector/YourICSServerName.
After purging the data in WIP tables,Gohead and also purge the messages in your AP/YourConnector/YourICSServerName queue.
Back to top
View user's profile Send private message Visit poster's website
amateur10
PostPosted: Sun Dec 11, 2005 9:20 am    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

Thanks for help. My system is not working now. Once, I get it working, I will send my system jar file
thanks a lot
Back to top
View user's profile Send private message
amateur10
PostPosted: Sun Dec 11, 2005 5:06 pm    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

Hi pachyderm,

I sent jar file to you. But I got it working now using testconnector. I deleted everything from contrl centre in db and setup another db. Then it works.


thanks for willingness to look into my project.
Back to top
View user's profile Send private message
amateur10
PostPosted: Fri Dec 16, 2005 11:05 am    Post subject: Reply with quote

Centurion

Joined: 23 Nov 2005
Posts: 102

I have again the same problem of failed flow and i can not delete them. the project is still running but I can not delete them. the error message is

the component type is connector or colaboration.

I started ics with -i option, I deleted the repository but still invein. Can some one suggest how i can delete them

thanks
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic  Reply to topic Goto page 1, 2  Next Page 1 of 2

MQSeries.net Forum Index » WebSphere Interchange Server + Adapters » Unable to delete failed flow
Jump to:  



You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
Protected by Anti-Spam ACP
 
 


Theme by Dustin Baccetti
Powered by phpBB © 2001, 2002 phpBB Group

Copyright © MQSeries.net. All rights reserved.