Posted: Wed May 21, 2003 6:18 pm Post subject: How the cycle time in HOLOSOFX is calculated?
Master
Joined: 21 May 2003 Posts: 245 Location: Charlotte, NC
Hi there,
I am using the holosofx 4.2.3 for modeling. I was studying the Process summary report generated after running the Weigthed avg . It shows (for my scenorio) process time 2.4hrs, working time .75hrs which are based on elaspsed time and working time. also It shows cycle time as 8.55 hrs. I dont know what is formula that has been used to calculate cycle time. Document says it is the time difference between the starting time and Ending time(calander days).
did any body faced this problem?
There are two variables here:
1. critical path
2. calendar
i am assuming that u know what is the critical path. the total time is calculated for the critical path in your process.. which is the maximum time consuming path in the process..
the start time is the time on your calendar (which u defined or default calendar being used).. and considering the times (elapsed duration and transfer times) required for your activities, holidays.. time offs.. (if ur calendar says ..working hours are from 8am to 4pm and working days are mon-fri).. the end date and time is calculated.. the time difference between calendar end date/time and the calendar start date/time is ur cycle time..