Posted: Wed Mar 22, 2006 9:52 pm Post subject: GDC validation error
Centurion
Joined: 11 Aug 2005 Posts: 113
I have a process which has 2 blocks and 2 activities at the top level. I have defined a GDC at the top level based on a data structure used by one of the activities.
When i try to export this as a FDL, it gives me a validation error saying the blocks do not have the same GC as the top level.
Is it neccesary for all the blocks to have the same GC or is there something else to be done?
Note : I am using Workbench 4.2.4 FP3 _________________ Srisudhir Tadepalli
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum