Posted: Wed Jan 11, 2006 8:42 am Post subject: Applying CSDs without stopping brokers |
|
|
 Centurion
Joined: 22 Jan 2004 Posts: 148
|
Hi,
We have our production brokers running on AIX with WMQI at CSD level 5. We are shortly planning to upgrade them to CSD level 9. Is there a proven way of upgrading WMQI without stopping brokers? Any inputs are greatly appreciated.
Thanks. |
|
Back to top |
|
 |
Paul D |
Posted: Wed Jan 11, 2006 9:30 am Post subject: |
|
|
 Master
Joined: 16 May 2001 Posts: 200 Location: Green Bay Packer Country
|
I do not think this is possible in any way, shape or form. _________________ Thanks!!!
Paul D |
|
Back to top |
|
 |
mqsidude |
Posted: Wed Jan 11, 2006 10:52 am Post subject: |
|
|
 Centurion
Joined: 22 Jan 2004 Posts: 148
|
I wonder what best strategy the WMQI veterans are following to upgrade their production brokers with minimum or no downtime! |
|
Back to top |
|
 |
jefflowrey |
Posted: Wed Jan 11, 2006 10:57 am Post subject: |
|
|
Grand Poobah
Joined: 16 Oct 2002 Posts: 19981
|
I think most people accept the downtime, and do the sensible thing, which is plan for it.
Some people probably do the unsensible thing, which is build an entirely new infrastructure with the new CSDs applied, and then move all the flows and sets and connections. _________________ I am *not* the model of the modern major general. |
|
Back to top |
|
 |
premkumar |
Posted: Wed Jan 11, 2006 10:35 pm Post subject: |
|
|
 Apprentice
Joined: 24 Feb 2004 Posts: 40
|
Hi,
Yes, it is recommended to have a down time during the up gradation. So that in case of any issues u can rollback. Also it is required a basic sanity testing required before realizing to the production.
Since u should have used any custom node or user node that may not be tested in new version. This issue will be showstopper if it is not notified properly.
During the up gradation the brokers have to be stopped for the consistency. _________________ Thanks and Regards,
Premkumar.S |
|
Back to top |
|
 |
mqsidude |
Posted: Thu Jan 12, 2006 7:57 am Post subject: |
|
|
 Centurion
Joined: 22 Jan 2004 Posts: 148
|
Thank you all for the responses. Now I am more confident in arguing with my higherups for a downtime!  |
|
Back to top |
|
 |
PeterPotkay |
Posted: Thu Jan 12, 2006 8:03 am Post subject: |
|
|
 Poobah
Joined: 15 May 2001 Posts: 7722
|
the best is to have 2 or more brokers, MQ clustered. While you upgrade one, the other handles the load, so no downtime.
Argue for 2 or more brokers...... _________________ Peter Potkay
Keep Calm and MQ On |
|