ASG
IBM
Zystems
Cressida
Icon
Netflexity
 
  MQSeries.net
Search  Search       Tech Exchange      Education      Certifications      Library      Info Center      SupportPacs      LinkedIn  Search  Search                                                                   FAQ  FAQ   Usergroups  Usergroups
 
Register  ::  Log in Log in to check your private messages
 
RSS Feed - WebSphere MQ Support RSS Feed - Message Broker Support

MQSeries.net Forum Index » WebSphere Message Broker (ACE) Support » Bar file not including changes to a subflow

Post new topic  Reply to topic
 Bar file not including changes to a subflow « View previous topic :: View next topic » 
Author Message
EnOne
PostPosted: Wed Jun 18, 2014 7:31 am    Post subject: Bar file not including changes to a subflow Reply with quote

Centurion

Joined: 09 Oct 2002
Posts: 100
Location: Kansas City

I am trying to make changes to a subflow within a message flow. When I make this change and then build the BAR file the esql code is not being updated. I can verify this by looking at the cmf file within the unzipped bar file and looking at it in notepad. This is a message flow project referencing a subflows project.

Compile and in-line resources is checked
Remove contents of the archive before is checked
Override configurable property values is checked

I am at a loss why this would be happening I tried creating a new workspace and the same issue is occurring.

Broker 8.0.0.2 running on Windows 7x64

Nick
Back to top
View user's profile Send private message
fjb_saper
PostPosted: Wed Jun 18, 2014 7:39 am    Post subject: Re: Bar file not including changes to a subflow Reply with quote

Grand High Poobah

Joined: 18 Nov 2003
Posts: 20756
Location: LI,NY

EnOne wrote:
I am trying to make changes to a subflow within a message flow. When I make this change and then build the BAR file the esql code is not being updated. I can verify this by looking at the cmf file within the unzipped bar file and looking at it in notepad. This is a message flow project referencing a subflows project.

Compile and in-line resources is checked
Remove contents of the archive before is checked
Override configurable property values is checked

I am at a loss why this would be happening I tried creating a new workspace and the same issue is occurring.

Broker 8.0.0.2 running on Windows 7x64

Nick

Are you sure you do not have automatic compile turned off? If you do you must first compile the project before creating the bar file...
_________________
MQ & Broker admin
Back to top
View user's profile Send private message Send e-mail
EnOne
PostPosted: Wed Jun 18, 2014 8:06 am    Post subject: Reply with quote

Centurion

Joined: 09 Oct 2002
Posts: 100
Location: Kansas City



Thank you that was it I must have unchecked "Build Automatically" some time when I was trying to hit "Clean..."

Thanks again for your help.
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic  Reply to topic Page 1 of 1

MQSeries.net Forum Index » WebSphere Message Broker (ACE) Support » Bar file not including changes to a subflow
Jump to:  



You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
Protected by Anti-Spam ACP
 
 


Theme by Dustin Baccetti
Powered by phpBB © 2001, 2002 phpBB Group

Copyright © MQSeries.net. All rights reserved.