Author |
Message
|
gecs |
Posted: Sat May 29, 2010 3:21 pm Post subject: Problem with node TimeoutNotification Node |
|
|
 Acolyte
Joined: 14 Nov 2007 Posts: 58
|
Hi everybody,
I deployed a flow that contains timer nodes, but I forgot change "Operation mode" property to the respective node, so after deploy, the flow is running and I can't stop and detele this. I stopped the EG (kill process), but when I restarting the EG this flow starts.
Additional Info
------------------
SO: Unix
Broker: 7.0
MQ: 7.0
thanks in advance |
|
Back to top |
|
 |
smdavies99 |
Posted: Sat May 29, 2010 10:11 pm Post subject: |
|
|
 Jedi Council
Joined: 10 Feb 2003 Posts: 6076 Location: Somewhere over the Rainbow this side of Never-never land.
|
Have your tried deleting the deployed Children?
If you can't do that then the easy way out is to delete the ExecutionGroup. _________________ WMQ User since 1999
MQSI/WBI/WMB/'Thingy' User since 2002
Linux user since 1995
Every time you reinvent the wheel the more square it gets (anon). If in doubt think and investigate before you ask silly questions. |
|
Back to top |
|
 |
smdavies99 |
Posted: Sat May 29, 2010 10:11 pm Post subject: |
|
|
 Jedi Council
Joined: 10 Feb 2003 Posts: 6076 Location: Somewhere over the Rainbow this side of Never-never land.
|
Have your tried deleting the deployed Children?
If you can't do that then the easy way out is to delete the ExecutionGroup. _________________ WMQ User since 1999
MQSI/WBI/WMB/'Thingy' User since 2002
Linux user since 1995
Every time you reinvent the wheel the more square it gets (anon). If in doubt think and investigate before you ask silly questions. |
|
Back to top |
|
 |
mqjeff |
Posted: Sun May 30, 2010 8:38 am Post subject: |
|
|
Grand Master
Joined: 25 Jun 2008 Posts: 17447
|
Why not just redeploy the flow again after changing the property?
 |
|
Back to top |
|
 |
gecs |
Posted: Mon May 31, 2010 8:37 am Post subject: |
|
|
 Acolyte
Joined: 14 Nov 2007 Posts: 58
|
yeah!... thanks mqjeff .. redeploying the flow works! |
|
Back to top |
|
 |
|