It's given in the IBM doc (in section: Migrating from Version 2.1 to Version 6.0: Version 6.0 coexisting temporarily with Version 2.1) that the Version 2.1 broker should be stopped immediately after deployment of version 6 broker.
Is it a must that 2.1 broker should be stopped once the verion 6 broker is deployed? Because we are planning to tun both the Broker version 2.1 and Broker version 6 to RUN PARALLELY (without causing any disturbance for the current 2.1 broker, annd at the same time test on the broker v 6) for atleast 2 weeks and then shutdown the broker v 2.1. Is it possible to do so? Kindly let me know.