Posted: Thu Aug 17, 2006 4:08 pm Post subject: MQSI to WMB Migration
Centurion
Joined: 20 Jul 2003 Posts: 131
Hi all
We are in the planning stage of migrating from MQSI to WMB. As we do not need a database to store the MRM data and the configuration, we need to integrate the Toolkit with a source control.
We plan to migrate first and then work on the source control integration.
If we do this, what happens in the event the Windows Server (containing the Config info and the MRM) crashes? I mean before we integrate the Toolkkit with Source control? Where is the info stored? I know it is stored internally but is it back up-able?
How do we deal with this scenario? Any suggestions? Thanks.
Joined: 02 Jun 2005 Posts: 3316 Location: IBM (retired)
With the V5 and V6 toolkit, the "projects" (message flows, message sets...) are stored in the filesystem as plain xml files. This can either be a local or shared drive. Backing up the "worksapce" directory is sufficient .... _________________ -wayne
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum