Posted: Wed Apr 27, 2005 12:47 pm Post subject: Work assignment
Apprentice
Joined: 14 May 2003 Posts: 29 Location: Wisconsin
I a flow that has a decision point that will route the flow one of two ways. When the two routes meet up again I have an activity that I need to be performed by either the starter of an activity in one path but if that path was not taken then I would like to assign the activity to an input container value.
Is there a way in a PHI (or an activity) to tell me who preformed an activity so I can copy that over to a container field?
<>-->A---->D--->E
|___> B--->C__|
<> decison point that splits the flow two ways. If activity B is performed than I would like E to be performed by the starter of B, but if A,D is performed than I want activity E assigned to an container data field.
Posted: Wed Apr 27, 2005 1:50 pm Post subject: Re: Work assignment
Jedi Knight
Joined: 27 Jun 2001 Posts: 3081 Location: EmeriCon, LLC
ChrisThomas wrote:
Is there a way in a PHI (or an activity) to tell me who preformed an activity so I can copy that over to a container field?
Best you can do is to have the activity write the user who actually ran the activity to a member in the output container. _________________ John McDonald
RETIRED
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum